Bid Information

For questions regarding a bid, please email bid@pogueconstruction.com.

For bid tab requests and feedback on the status of your bid, please email tab@pogueconstruction.com.

To get on Pogue’s bidder’s list, please fill out this form: https://projects.isqft.com/pogueconstruction/form

Town of Prosper Central Fire Station and Administration

Bid Date: December 8, 2021
Owner: Town of Prosper
Lead Estimator: Josh Neumaier
Phase: Bidding/GMP
Location:

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

 

Pogue Construction is the Construction Manager for this project. This project consists of the construction of a new Central Fire Station and Fire Administration Building for the Town of Prosper, including Civil, Structural, Architectural, Fire Suppression, Plumbing, Mechanical, and Electrical Work.

View/Download Bid Documents

McKinney ISD Elementary School #22

Bid Date: December 14, 2021
Owner: McKinney ISD
Lead Estimator: Josh Neumaier
Phase: Bidding/GMP
Location: McKinney, TX

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected general contractor for the project. This project consists of the construction of a new Elementary School for McKinney Independent School District, including Civil, Structural, Architectural, Fire Suppression, Plumbing, Mechanical, and Electrical work.

View/Download Bid Documents

Traxxas Mechanical Upgrade

Bid Date: January 5, 2022
Owner: Traxxas
Lead Estimator: Chris Broerman
Phase: Bidding/GMP
Location: McKinney, TX

Bid Time: 2:00PM

Bids Delivered To: bid@pogueconstruction.com

Narrative:

Mechanical System:

This package would consist of adding six (6) new 25-Ton DX packaged rooftop cooling units for conditioning of the plan north warehouse. The plan south second floor storage space would be served by four (4) 25-Ton DX packaged RTUs and the first floor would be served by three (3) 25-TonRTUs. Duct will need to be routed through the second floor down to serve the first, and architectural shafts provided. High velocity jet-style air circulation fans shall also be provided throughout the space for the plan north warehouse and first floor of the plan south warehouse for improved air movement. Our proposal for the plan south warehouse space is designed around the use case. Because the second floor is typically unoccupied and used primarily as storage, this space would not require jet-style fans.

Electrical considerations for added HVAC:

A new 1000A panel shall be fed via three (3) sets of 4#400 AWG conductors from the main distribution board (MDB). This new panel shall be dedicated to service the newly added mechanical equipment. New board shall be located within the warehouse space near the main electrical room.

Standby Generator Backup:

After reviewing the provided utility bills for building electrical consumption, and accounting for the additional load added by the new mechanical equipment, it is our recommendation to provide a 800 kW standby natural gas generator with dual fuel options and sound enclosure. Please reference Site Plan PDF for two proposed locations.

View/Download Bid Documents

Eagle Mountain-Saginaw ISD – Eagle Mountain High School #4

Bid Date: January 11, 2022
Owner: Eagle Mountain-Saginaw I.S.D.
Lead Estimator: TBD
Phase: Competitive Sealed Proposal/Hard Bid
Location: Fort Worth, TX

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The work comprises the construction of Eagle Mountain High School for Eagle Mountain-Saginaw Independent School District, Fort Worth, Texas, as shown on the drawings and described in the specifications. The project is a new ground-up high school including stadium. The work will be done under one lump sum contract.

View/Download Bid Documents