Alvin ISD E.C. Mason Replacement Elementary School

Bid Date: July 16, 2019
Owner: Alvin ISD
Lead Estimator: Kevin Hollenbeck
Project Location: Manvel, Texas between FM1128, Lewis Ln, School Road, and Large Ave, 77583
Phase: Competitive Sealed Proposal/Hard Bid

A. The Project consists of construction of a 2-story 103,000 SF new E.C. Mason Elementary School Replacement and related sitework in Manvel, Texas between FM1128, Lewis Ln, School Road, and Large Ave, as indicated on the Contract Documents prepared by Stantec Architecture and consultants, dated June 24, 2019.

B. The Work consists of Civil, Landscape, Structural, Architectural, Mechanical, Electrical, Plumbing, and Fire Protection requirements as indicated in the Project drawings and specifications.

C. There will be roadwork on FM1128 and School Road that will be by a separate contract. Close coordination with that work will be required.

REQUIRED COMPLETION DATES:
A. The Work shall be conducted according to the following schedule to ensure that the Owner has sufficient opportunity to ready the facility for occupancy and permit an orderly transfer of personnel, furnishings, and equipment.
1. Start Date for On-Site Construction: Approximately September 1, 2019
2. Project Substantial Completion Date: On or before December 1, 2020

BIDDING SCHEDULE:
• Senior Estimator: Kevin Hollenbeck
• Addendum #01: 6/28
• Pre-Bid Meeting: 7/2 @ 1:30 PM
Alvin ISD Transportation Center at Heritage Complex (behind Freedom Field)
4411 Davenport Parkway (County Road 64)
Iowa Colony, Texas 77583
• Last day for bidder RFI’s: 7/9 Send all RFI’s to khollenbeck@pogueconstruction.com
• Addendum #02 (last): 7/10

Bid Day: July 16, 2019

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Download Bid Documents

Plano Highpoint Tennis Center

Bid Date: July 17, 2019
Owner: City of Plano
Lead Estimator: Mitch Spencer
Project Location: Plano, TX
Phase: Bidding/GMP

Pogue Construction is the selected General Contractor for this project. The Plano Highpoint Tennis Center project is a new 7,500 SF, two-story, wood framed tennis pro shop and relocated tennis court. The existing tennis pro shop and a tennis court will be demolished to accommodate the new facility. A new parking lot with deceleration lanes will be included as well.

Bid Forms will be issued the week of July 2nd and RFI’s must be returned to Pogue Construction no later than June 28th.

Bid Day: July 16th

Bid Time: 2:00PM

Estimated Start Date: August 2019

Estimated End Date: August 2020

Design Team: JBI and GGO

Download Bid Documents

Key School of Fort Worth

Bid Date: July 2019
Owner: Key School
Lead Estimator: Chris Hysaw
Project Location: North side of Interstate 30 at Morrison Dr in Fort Worth (7700 E Freeway, Fort Worth, TX 76120)
Phase: Upcoming Projects

Pogue Construction is the selected General Contractor on this project. New private school campus.

Designer: HH Architects
Approximate Budget: $10,600,000
Bid date: July, 2019
Estimated Start Date: August, 2019
Estimated End Date: September, 2020
Bid Documents will be available: July, 2019

Wylie High School Additions & Renovations

Bid Date: July 2019
Owner: Wylie ISD
Lead Estimator: Derek Steinmeyer
Project Location: Wylie, Texas
Phase: Upcoming Projects

This is a CM@R project and Pogue is the selected Construction Manager. New additions to existing buildings onsite at the existing Wylie High School campus, along with renovations to the interiors of multiple spaces.

Designer: PBK

Approximate Budget: $56,000,000

Estimated Bid Date: July 2019

Estimated Start Date: August 2019

Estimated Completion: August 2021

Bid Documents will be available: July 2019

 

**Bid Documents are not available at this time.**

Mesquite ISD Choice High School

Bid Date: August 2019
Owner: Mesquite ISD
Lead Estimator: Kevin Hollenbeck
Phase: Upcoming Projects

Pogue Construction is the selected General Contractor for this project. The project consists of a new Career and Technology Education center for Mesquite ISD high school students. The new school site is located at an approximately 44-acre undeveloped site at the north intersection of Faithon P Lucas Sr. Blvd and McKenzie Road in Mesquite, TX (east of existing City of Mesquite softball fields). The program includes career and college preparation departments that will provide project-based learning for real world experience.

The school will include departments, such as:
Engineering – Computer Labs, Robotics, Automotive, Maker Spaces, etc.
Health Science – Labs, EMT, Pharmacy, Sports Medicine, Dental, etc.
Technology – Computer Sciences, Maker Spaces, Graphic Design, etc.
Construction Science – Architecture, Construction Shops, Maker Spaces, etc.
Core curriculum – Media Center, Admin, Dining Hall, and Core Classrooms

• The building will utilize sustainability features that allow focus on reducing energy consumption, minimizing long-term environmental impact, and daylighting to efficiently reduce the cost of lighting and cooling.

• The scope of construction will also include an ICC 500 storm shelter (approx. 13,000 SF) serving the entire school and other safety features that allow students to feel safe.

• Approximate Area: 250,000 SF total on (2) two stories

Construction start: October 2019
Completion: July 2021

Bid Documents are not available at this time.

Download Bid Documents

Wylie Public Safety & Courts

Bid Date: August 30, 2019
Owner: City of Wylie
Lead Estimator: Chris Broerman
Project Location: 2000 N Highway 778, Wylie TX 75098
Phase: Bidding/GMP

Pogue Construction is the selected General Contractor for this project. Renovation of the existing Public Safety Building (33,600 SF), an Admin / Courtroom addition (14,600 SF), a Sallyport addition (3,200 SF) and associated site work (7.2 acres).

Bids Due: 2:00 PM

Bids Delivered to: bid@pogueconstruction.com

Location: 2000 Highway 78; Wylie, TX 75098
Estimated Start Date: September 3, 2019
Estimated End Date: September 3, 2020
Pre-Bid Meeting: July 18, 2019 @ 1PM (at the project site)

 

*NOTE – Technology drawings and specifications will be issued with Addendum 1 by 7/19/19.

Download Bid Documents

Princeton ISD – Lovelady High School

Bid Date: October 2019
Owner: Princeton ISD
Lead Estimator: Chris Broerman
Project Location: Princeton, TX
Phase: Upcoming Projects

Pogue Construction is the selected General Contractor for this project which consists of a new two-story 9th & 10th Grade Center (~180,000 SF) and associated sitework. This building will include an ICC 500 storm shelter.

Designer: Claycomb Associates

Estimated Bid Date: October 3, 2019

Estimated Start Date: November 1, 2019

Estimated Completion Date: July 1, 2021

Bid Documents are not available at this time.