Lakeview Middle School Electrical Upgrades
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com
The Lakeview Middle School Electrical Upgrades project consists of a complete demo and replacement of the existing electrical switchgear in the building. This is a CMAR project located in The Colony, TX, and Pogue Construction is the selected General Contractor.
A Pre-Bid for these projects will be held tomorrow, January 14 @ 10AM
Join Zoom Meeting
https://pogueconstruction.zoom.us/j/8024773618
Meeting ID: 802 477 3618
One tap mobile
+13462487799,,8024773618# US (Houston)
+12532158782,,8024773618# US (Tacoma)
Pre-Bid Walk-Thru: January 18, 2021
1:00 PM – 3:00 PM – Homestead ES and Southridge ES, starting at Homestead ES
3:00 PM – 4:00 PM – Lakeview MS
LISD Southridge & Homestead 20 Year Refresh
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com
Homestead Location: 1830 E Branch Hollow Dr, Carrollton, TX 75007
Southridge Location: 495 W Corporate Dr, Lewisville, TX 75067
The Homestead & Southridge ES 20 Year Refresh project consists of renovation and replacement of existing building components including mechanical, electrical, and plumbing systems, paint, roofing, flooring, wall finishes, A/V equipment, technology and security equipment, casework, door and hardware, furniture, and other items. Pogue Construction is the selected General Contractor for this project.
Important Note: A virtual prebid will be held on January 14th followed by a site walk for each campus to be conducted on January 18th.
A Pre-Bid for these projects will be held January 14 @ 10AM
Join Zoom Meeting
https://pogueconstruction.zoom.us/j/8024773618
Meeting ID: 802 477 3618
One tap mobile
+13462487799,,8024773618# US (Houston)
+12532158782,,8024773618# US (Tacoma)
Pre-Bid Walk-Thru: January 18, 2021
1:00 PM – 3:00 PM – Homestead ES and Southridge ES, starting at Homestead ES
3:00 PM – 4:00 PM – Lakeview MS
Key School
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com
Architect: HH
Appox. Budget: $2,500,000.00
Pogue Construction is the selected General Contractor for this project. This will be a new private school located in Fort Worth, Texas. This project consists of renovation of existing three story building, including selective demolition, new flooring and ceiling finishes, new MEP infrastructure including fire detection and suppression, Life Safety upgrades, A/V and Security upgrades.
Pre-Bid Conference: A pre-bid meeting will be held January 19, 2021 at 10AM at 7950 John T White Rd, Fort Worth TX 76120. Everyone is highly encouraged to attend.
Community ISD ES #3 & HS Renovations
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com
Pre Bid: January 14, 2021 @1PM, at the Community ISD Administrative Offices (Old Middle School Cafeteria), located at 611 FM 1138 North, Nevada, Texas. Attendance is strongly encouraged by an administrative representative of the company or corporation submitting a bid as a General Contractor and Sub-contractor for the work.
High School Addition and Renovation and Middle School Renovations are bidding as one project. High School work consists of: 8 classroom additions, minimal associated site work, and minor renovations to the existing building. Middle School work consists of: bathroom renovations and door and door hardware replacements.
Elementary School #3 is a new ground up elementary school and associated site work.
Cleveland ISD New Middle School & Elementary School
Bid Day: February 2, 2021
Bid Time: 1:00PM
Bids Delivered to: bid@pogueconstruction.com
The Owner plans to build a new two-story Middle School
(approximately 230,000 sf for approximately 1,600 students) and new two-story Elementary
School (approximately 130,000 sf for approximately 1,000 students). The Project may include
the following general scope items:
1. Site utilities,
2. Concrete paving
3. Foundation
4. Steel Structural frame
5. Metal fabrications
6. Face brick veneer & CMU
7. Aluminum, glass and window wall
8. Metal & TPO Roofing
9. Interior walls
10. Tile, resilient flooring, sheet carpeting
11. Suspended drywall, lay-in panels, sound absorbing units
12. Steel doors and frames, aluminum frames, plywood clad wood doors, Kynar
coated storefront
13. Casework
14. Specialties
15. Hydraulic elevator
16. Automatic sprinkler system
17. Plumbing systems
18. HVAC Systems and building automation
19. Electrical, technology wiring, lightning protection and emergency power
20. Fire detection, alarm and emergency call systems
Substantial Completion: May 1, 2022 for Elementary School & July 1, 2022 for Middle School
Estimated Cost: $75,000,000
Architect: Huckabee
Pre-Bid Meeting: Wednesday, 20 January 2021 @ 12:00 p.m. C.S.T.
In-person Location of Pre-Proposal Conference:
Cleveland ISD Service Center
326 FM 1010 Rd
Cleveland, Texas 77327
Virtual location of Pre-Proposal Conference:
1. Meeting video conference link:
a) https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjUxMTNhNDgtNjVjMC00ZjllLWIwMDMtYzkxNDNmY2FiNmE4%40thread.v2/0?context=%7b%22Tid%22%3a%226724d89b-03d2-4528-9030-0eb337b1b2bb%22%2c%22Oid%22%3a%2270b2af40-0328-4eae-8897-31f803f12229%22%7d
City of Wylie Fire Station #4
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com
Pogue is the selected General Contractor for this project. This project consists of a roughly 16,300 Square Foot Fire Station in Wylie, Texas. This includes 3 Drive Through Apparatus Bays, Apparatus Support Spaces, Living Quarters, and an ICC-500 Rated Storm Shelter Room.
Arlington ISD Webb Elementary School Replacement
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com
Estimate Start Date: April 13, 2021
Estimated End Date: May 31, 2023
Phasing Plan: Reference Volume 1 sheet AS0.0 for important Phasing Notes
Project Description: Webb Elementary School consists of a new two-story school building (102,907 SF) and associated site work including playground areas, basketball courts and parking lots/drives. This project is a replacement school and construction will be performed on an active site. Reference phasing plans for more information.
Pre Bid: 1/20/2021 @ 10AM.
The Link to the Zoom meeting is:
https://us02web.zoom.us/j/81450786371?pwd=NWRkbDlGKys4SGRSRjRQaW5nbXBhdz09
Prosper HS #3
Architect: Huckabee
Pogue Construction is the selected General Contractor for this project. The scope of work for this project includes a new 531,000 sqft, two-story high school building, a new 76,000 sqft multi-purpose building and multiple sports related out buildings on an 81 acre site located approximately at East 1st Street and Granite Shoal Drive in Prosper, TX.