Lewisville ISD Hebron High School 20 Year Refresh

Bid Date: January 23, 2020
Owner: Lewisville ISD
Lead Estimator: Gale Roberge
Phase: Bidding/GMP

Pogue Construction is the selected General Contractor for this project. Multi-phased renovation of an occupied campus including renovation/replacement of plumbing, mechanical and electrical systems, elevator upgrades, roofing, interior finishes, A/V, technology, security, millwork, doors/frames/hardware, lab casework/equipment and music equipment.

Bid Day: January 23, 2020

Bid Time: 2:00 PM (CST)

Bids Delivered to: bid@pogueconstruction.com

Important Note: Pre-Bid Meeting will be held Monday, January 20, 2020 at 9:00AM at Hebron High School (please meet at the Pogue Construction trailer located on the south side of the high school and north of the baseball field).

View/Download Bid Documents

Lewisville ISD Chester Boyd Ag Center Addition

Bid Date: January 23, 2020
Owner: Lewisville ISD
Lead Estimator: Gale Roberge
Phase: Bidding/GMP

Pogue Construction is the awarded Construction Manager for this project. New 1,600+ SF pre-engineered metal building addition and 5,000+/- SF pre-engineered metal building open air structure including select demo, concrete foundations, flatwork, sidewalks, masonry walls, pipe bollards, downspout boots, sealants, doors/frames/hardware, sealed concrete, painting, room signage, specialties, plumbing, HVAC, electrical, sitework, termite treatment, pavement markings, fencing, site utilities.

 

Bid Day: January 23, 2020

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

 

Important Note: Pre Bid Meeting will be held Monday, January 20, 2020 at 11:00AM at the Lewisville ISD Boyd Agricultural Center (160 Fish Hatchery Rd, Lewisville, TX 75056).

View/Download Bid Documents

Lewisville ISD Forest Vista 20 Yr Refresh

Bid Date: February 4, 2020
Owner: Lewisville ISD
Lead Estimator: Gale Roberge
Phase: Bidding/GMP

Designer: Huckabee

Pogue Construction is the selected General Contractor for this project. This project includes renovation and replacement of existing building components including mechanical, electrical, and plumbing systems, paint, roofing, flooring, wall finishes, A/V equipment, technology and security equipment, casework, door and hardware, furniture, and other items.

View/Download Bid Documents

Lewisville ISD Garden Ridge ES Restroom Renovation & Flooring Replacement at 4 Campuses

Bid Date: February 4, 2020
Owner: Lewisville ISD
Lead Estimator: Gale Roberge
Phase: Bidding/GMP

Designer: Huckabee

Pogue Construction is the selected General Contractor for these projects. The Garden Ridge ES Restroom Renovation is the renovation of campus restrooms and replacement of plumbing fixtures. The Flooring Replacement at 4 Campuses project includes replacement of flooring material at Castle Hills Elementary in Lewisville, Hebron Valley Elementary in Carrollton, Indian Creek Elementary in Carrollton, and Liberty Elementary in Flowermound.

 

Bid Documents are not available at this time.

View/Download Bid Documents

Community Athletic Improvements

Bid Date: February 6, 2020
Owner: Community ISD
Lead Estimator: Mitch Spencer
Phase: Competitive Sealed Proposal/Hard Bid

The Community Athletic Improvements Project for Community ISD consists of renovations to the existing Baseball and Softball fields, and a new press box for the Football Field. The 140,000 SF Baseball field will be replaced by a new synthetic turf, clay infield, bleachers, press box, LED Lighting, and dugouts. The 50,000 SF Softball field will receive the same upgrades as the baseball field. THE SYNTHETIC TURF FOR BOTH FIELDS IS A DELEGATED DESIGN. The new football press box will be a prefabricated press box with a covered observation deck. There are two (2) alternates. Alternate One is to provide two turf football practice fields. Alternate Two is to provide new Pre-Engineered Metal Building Batting Cages and Bullpens.

 

*IMPORTANT NOTE* A pre-bid meeting will be held at the Community ISD Softball/Baseball Complex at 611 FM 1138 North, Nevada, TX, on Thursday, January 23rd at 11:00 AM. It is strongly advised that subcontractors intending to bid attend the site walk.

View/Download Bid Documents

Arlington ISD Gunn Fine Arts & Dual Language Academy

Bid Date: February 12, 2020
Owner: Arlington ISD
Lead Estimator: Chris Hysaw
Phase: Upcoming Projects

Pogue Construction is the selected General Contractor on the Arlington ISD – Gunn Fine Arts and Dual Language Academy. The first phase of the project was the civil site package and has already been bid. The second phase of the project is the building portion which includes and is not limited to, Demolition, Drywall, Structural Steel, and Electrical and Mechanical trades. The building project is set to begin in April of 2020 and run through September of 2022.

Bid Day: February 12, 2020

Bid Time: 2:00 PM (CST)

Bids Delivered to: bid@pogueconstruction.com

Important Note: This project will be constructed at an active campus. Reference the phasing plan for full details of project phasing requirements.

View/Download Bid Documents

City of Plano High Point North Maintenance Facility

Bid Date: March 18, 2020
Owner: City of Plano
Lead Estimator: Mitch Spencer
Phase: Upcoming Projects

Pogue Construction is the selected General Contractor on this project. The High Point North Maintenance Facility project is a new, 22,000 SF facility for the City of Plano. The building will provide work shop space and offices for the Parks and Recreation department. Outside the building will be a fenced in area for storage of city vehicles and material storage.

Architect: Huitt-Zollars

Bid Documents are not available at this time.

View/Download Bid Documents

Wylie ISD Cox Elementary School Addition and Renovations

Bid Date: March 26, 2020
Owner: Wylie ISD
Lead Estimator: Mitch Spencer
Phase: Upcoming Projects

The Cox Elementary School Addition and Renovations project consists of a 6-Classroom, 9,000 SF Storm Shelter addition and renovations to the main office and library. A new playground will also be constructed as well as a new Canopy Entrance at the drop-off zone.

**Bid Documents are not available at this time.**

View/Download Bid Documents

Wylie ISD Bush Elementary School Addition and Renovations

Bid Date: March 26, 2020
Owner: Wylie ISD
Lead Estimator: Mitch Spencer
Phase: Upcoming Projects

The Bush Elementary School Addition and Renovations project consists of a 2-Story addition providing 2 Kindergarten Classrooms and 10 standard classrooms. Three classrooms on the first floor, including the restrooms, will serve as a 4,400 SF Storm Shelter Addition as well. A new 850 SF Serving Line Addition will also be constructed. The renovations consist of providing Security Film to the Reception Area and renovating an existing room to serve as a second Art Room. Outside, a new access road will be constructed at Cutter Crossing, and new parking and drive lanes will be added to accommodate the addition.

**Bid Documents are not available at this time.**

View/Download Bid Documents

Wylie ISD Harrison Intermediate School

Bid Date: March 26, 2020
Owner: Wylie ISD
Lead Estimator: Derek Steinmeyer
Phase: Upcoming Projects

This project is a roughly 30,000 SF addition to the existing Wylie ISD Harrison Intermediate School Campus. The addition consists of a new cafeteria/kitchen area, as well as a six classroom storm shelter. There are miscellaneous renovations throughout.

**Bid Documents are not available at this time.**

View/Download Bid Documents

Goose Creek JHS #6

Bid Date: April 9, 2020
Owner: Goose Creek CISD
Lead Estimator: Derek Steinmeyer
Phase: Upcoming Projects

Designer: Pfluger

Pogue Construction is the selected General Contractor for this project. This is a new Junior School that is approximately 180,000 square feet. This will be a two-story facility for 6th, 7th, and 8th grade students. It will consist of an administration area, library, special education classrooms, science labs, fine arts spaces, computer labs, full service kitchen and cafeteria, performing arts auditorium, and competition gyms.

Bid Documents are not available at this time.

View/Download Bid Documents

Key School of Fort Worth

Bid Date: August 11, 2020
Owner: Key School
Lead Estimator: Chris Hysaw
Phase: Upcoming Projects

Pogue Construction is the selected General Contractor on this project. New private school campus.

Designer: HH Architects
Approximate Budget: $10,600,000
Bid date: TBD

BID DOCUMENTS ARE NOT AVAILABLE AT THIS TIME

View/Download Bid Documents