Past Bids

Prosper Public Safety Building

Bid Date: April 23, 2019
Owner: Town of Prosper, Texas
Lead Estimator: Derek Steinmeyer
Project Location: On property to be developed east of Dallas Parkway between Prosper Trail and west First Street
Phase: Past Projects

The Prosper Public Safety Building consists of a New 23,159 sf building and approximately 5 acres of associated site work.

BIDDER WILL BE REQUIRED TO FILL OUT A JOB SPECIFIC BIDFORM THAT WILL BE PUBLISHED BY POGUE CONSTRUCTION.

Building Work includes but is not limited to the following: Concrete, Masonry, Structural Steel, Specialty Metals, Carpentry, Waterproofing, Roofing & Sheet Metals, Doors-Frames & Hardware, Glass & Glazing, Plaster/ Stucco, Drywall, Flooring (Tile, Carpet, Athletic, Access), Painting, Miscellaneous Specialties (Visual Display Boards, Signage, Toilet Accessories- Partitions, Wall protection, Life Safety Specialties, Lockers & Metal Shelving, Awnings & Flagpoles), Appliances, Window Treatments, Fire Suppression, Plumbing, HVAC, Electrical, Voice & Data, AV, Fire Alarm, Security/ Access Control.

Bid Day: April 23, 2019
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com

Download Bid Documents

Princeton ISD Huddleston Renovations & VoTech Addition

Bid Date: April 2, 2019
Owner: Princeton ISD
Lead Estimator: Chris Broerman
Project Location: 301 N 5th St, Princeton, TX 75407
Phase: Past Projects

Huddleston Intermediate Renovations consists of 1) conversion of existing library to a daycare area, 2) interior renovations at the Special Programs area, 3) interior renovations at the Huddleston classrooms / admin areas, 4) interior renovations at the Band Hall area (ALT #1), and 5) expansion of the existing Vocational Auto Tech Shop (ALT #2). This is a CM@R project located in Princeton, TX, and Pogue is the selected general contractor.

Estimated Start Date: June 1, 2019

Estimated Completion Date: July 15, 2020

***IMPORTANT NOTES***

*A Pre-Bid Conference will be held at 4:00PM on Wednesday, March 20, 2019, at the Huddleston Intermediate School.

*This project will consist of two (2) phases – please review and incorporate the “Phasing and Site Logistics Plan” and “Construction Schedule” into your pricing.

*RFI’s should be submitted in writing to the bid@pogueconstruction.com email prior to 3/28/19.

*Bid Packages will be issued the week before bid day. In order to consider your bid, we need you to submit a completed Bid Package for each scope of work you are pricing.

Download Bid Documents

Lewisville ISD Hebron HS MAC, IAC, & Practice Fields

Bid Date: March 26, 2019
Owner: Lewisville ISD
Lead Estimator: Chris Broerman
Project Location: 4207 Plano Pkwy, Carrollton, TX 75010
Phase: Past Projects

This project consists of an addition to the rear of the existing high school consisting of a new Multi-Purpose Activity Center (MAC) and Indoor Athletic Complex (IAC). We will also be relocating twelve (12) tennis courts and two (2) football / soccer practice fields with this project. This is a CM@R project located in Carrollton, TX, and Pogue is the selected general contractor.

Anticipated Bid Date: 3/26/19

• Estimated Start Date: June 1, 2019
• Estimated End Date: January 15, 2021

***IMPORTANT NOTES***

A Pre-Bid Conference will be held at 2:00PM on Tuesday, March 12, 2019, near the existing tennis storage building at the back of the high school.

This project will consist of three (3) phases – please review and incorporate the “Phasing and Site Logistics Plan” and “Construction Schedule” into your pricing.

RFI’s should be submitted in writing to the bid@pogueconstruction.com email prior to 3/21/19.

Bid Packages will be issued the week before bid day. In order to consider your bid, we need you to submit a completed Bid Package for each scope of work you are pricing. Thanks!

Download Bid Documents

Lewisville ISD Hedrick Middle School

Bid Date: February 28, 2019
Owner: Lewisville ISD
Lead Estimator: Kevin Hollenbeck
Project Location: Lewisville, TX
Phase: Past Projects

Hedrick Middle School is a new 170,510 SF middle school for Lewisville ISD. The project is on the site of the existing Hedrick ES & Hedrick MS, which both will be demolished in phases. Pogue is the selected Construction Manager for this project.

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Estimated Start Date: 6/15/19
Estimated End Date: 8/1/20

Note that a pre bid meeting will be held at Hedrick Middle School on 2/20/2019 at 2:30PM.

Parking will be in the back by the football field!

2:30- discuss schedule & site logisitics; field questions from subs
3:15- walk existing elementary school (ES gets out at 3)
4:15- walk existing middle school (MS doesn’t get out until 4:10)

Download Bid Documents

John & Judy Gay Library

Bid Date: February 12, 2019
Owner: City of McKinney
Lead Estimator: Mitch Spencer
Project Location: 6861 Eldorado Parkway, McKinney, TX
Phase: Past Projects

Architect: Hidell

Estimated Start Date: 3/6/2019

Estimated End Date: 3/5/2020
A 15,000 SF expansion to the existing John & Judy Gay Library. The new space will add areas for teens and toddlers, as well as a second meeting room. The exterior improvements include an access road to the neighboring Gabe Nesbitt park with attached parking, expansion of the existing parking lot, and a new outdoor patio space that can be accessed from the new toddler zone.

Download Bid Documents

Prosper ISD Middle School #4

Bid Date: February 5, 2019
Owner: Prosper ISD
Lead Estimator: Chris Broerman
Project Location: Fishtrap Road & Harper Road; Prosper, TX
Phase: Past Projects

A new two-story middle school (180,000 SF), concessions building (2,160 SF), storage building (1,472 SF) and pump house (186 SF) and associated site development (31 acres). This is a CM@R project located in Prosper, TX, and Pogue is the selected general contractor.

Estimated Start Date: February 18, 2019
Estimated End Date: July 31, 2020

***IMPORTANT NOTE***
The 100% CD’s have been uploaded and are available for bidding purposes. Please disregard the 95% CD’s we originally issued. Thank you!

Download Bid Documents

Eagle Mountain-Saginaw Copper Creek Elementary School

Bid Date: January 30, 2019
Owner: Eagle Mountain-Saginaw ISD
Lead Estimator: Chris Hysaw
Project Location: Palmito Ranch Rd and Copper Meadow Dr, Fort Worth, TX 76131
Phase: Past Projects

The Eagle Mountain-Saginaw Copper Creek Elementary School project consists of the construction of a new 77,200 s.f. Elementary School in Fort Worth. Project Scope includes Site Work, Landscaping, Civil, Structural and Technology for the construction of a new ground-up Elementary School. This project is a CSP bid and proposals are due back to Pogue no later than 2:00PM on Wednesday January 23rd. RFIs are due by January 16th at end of day to allow for processing.

Estimated Start Date: March 1, 2019

Estimated End Date: May 1, 2020

***NOTE*** A pre-proposal conference is scheduled for 10:00 am local time, Tuesday, January 8th, 2019 in the EMS ISD Board Room, located at 1200 Old Decatur Rd., Fort Worth, TX 76179.

Download Bid Documents

New Caney ISD Woodridge Forest Middle School Additions

Bid Date: January 29, 2019
Owner: New Caney ISD
Lead Estimator: Kevin Hollenbeck
Project Location: 4540 Woodridge Pkwy. Porter, TX 77365
Phase: Past Projects

The project includes a 16 classroom, two-story 28,000 SF addition, expansion of P.E. Athletic Locker Rooms, Fire Alarm Upgrade, 1,700 SF parking lot expansion (20 spaces) and other misc. upgrades.

Bids Due: 3:00PM

Designer: Texas IBI Group, Inc

• Pre-proposal Conference: January 16, 2019 @ 1:30 at the project
• Estimated Start Date: TBD
• Estimated End Date: TBD

Board Award Project: February 18, 2019
Building Permit: February 19, 2019
Substantially Complete: April 30, 2020

 

Download Bid Documents

Mansfield Worley MS, Wester MS, Police & Technology

Bid Date: January 24, 2019
Owner: Mansfield ISD
Lead Estimator: Chris Hysaw
Phase: Past Projects

This project consists of renovations and additions to three buildings at Mansfield ISD. This is a CM@R project located in Mansfield, TX, and Pogue is the selected General Contractor.

Worley Middle School scope includes a 10,000sf classroom addition, interior renovations with restroom & HVAC upgrades, exterior landscaping & drainage improvements, and sports lighting upgrades.

Wester Middle School scope includes interior renovations with restroom and HVAC system replacement, selective roofing demolition & replacement, exterior landscaping & drainage improvements, and sports lighting upgrades.

Police & Technology building scope includes interior locker room renovations, finish upgrades, and backup generator replacement.

Project Locations:

Worley MS – 500 Pleasant Ridge Dr, Mansfield, TX 76063

Wester MS, Police & Technology – 1520 N Walnut Creek Dr, Mansfield, TX 76063

Estimated Start Date: March, 2019

Estimated End Date: July, 2020

 

Download Bid Documents

Arlington ISD Wood Elementary School – Fire Alarm Only

Bid Date: January 10, 2019
Owner: Arlington ISD
Lead Estimator:
Phase: Past Projects

The Arlington ISD Wood Elementary Fire Alarm Replacement project is a Complete replacement of the existing Fire Alarm System in a 91,000 Sq Ft existing building. Project Scope includes demo of existing, rough in for new, and a new code minimum fire alarm system. The work will need to take place after hours during the school year or during the summer.

Location: 3300 Pimlico Dr, Arlington, TX 76017

Start Date: TBD

Completion Date: 7/31/2019

Download Bid Documents

Eagle Mountain Saginaw Multi Campus Renovation

Bid Date: December 11, 2018
Owner: Eagle Mountain-Saginaw ISD
Lead Estimator: Sean Reardon
Phase: Past Projects

The Eagle Mountain-Saginaw Multi Campus Renovation project consists of work at three separate locations: Highland Middle School, Creekview Middle School and Gililland Elementary School. The work at these locations is to be bid as one single project. Project Scope covers 62,712 s.f. and includes Landscape Improvements, Exterior renovations, Tennis court & Gym renovations, Interior renovations including lighting and mechanical, and Technology. This project is a CSP bid and proposals are due back to Pogue no later than 2:00PM on Tuesday December 11th. RFIs are due by December 3rd end of day to allow for processing.

Bid Date: December 11th 2019
Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

o Highland Middle School: 1001 E. Bailey Boswell Rd. Saginaw, Texas 76131
o Creekview Middle School: 6716 Bob Hanger St. Fort Worth, Texas 76179
o Gililland Elementary School: 701 Waggoman Rd. Blue Mound, Texas 76131

***NOTE*** A pre-proposal conference is scheduled for 3:00 pm local time, Wednesday, November 28, 2018 in the Library at Highland MS of the EMS ISD, located at 1001 E. Bailey Boswell Rd, Fort Worth, TX 76131.

Download Bid Documents

Mesquite ISD Administration Building Addition

Bid Date: December 6, 2018
Owner: Mesquite ISD
Lead Estimator: Chris Broerman
Phase: Past Projects

This project consists of an addition to the existing Administration Building and associated Sitework. There are also some renovation areas inside the existing building. This is a CM@R project located in Mesquite, TX, and Pogue is the selected general contractor.

Bid Date: December 6, 2018

Bids Due:2:00PM

Bids Delivered to: bid@pogueconstruction.com

Location: 3819 Towne Crossing Blvd.; Mesquite, TX 75150
Estimated Start Date: January 21, 2019
Estimated End Date: December 27,2019

***NOTE*** A Pre-Bid Conference will be held at 2:00PM on Wednesday, November 28, 2018, in the Administration Training Room at the Mesquite ISD Administration Building located at 3819 Towne Crossing Boulevard, Mesquite, Texas 75150. Attendance is highly encouraged for Electrical, Structural Concrete, Paint, Drywall, HVAC, HVAC Controls, Plumbing, Electrical and Technology subcontractors.

Download Bid Documents

Aubrey ISD Elementary School #3

Bid Date: November 28, 2018
Owner: Aubrey ISD
Lead Estimator: Kevin Hollenbeck
Phase: Past Projects

Bid Date: November 28, 2018 @ 2:00PM

School Board GMP Approval: November 28, 2018

Pre-Construction Conference: TBD

Notice to Proceed-Mobilization/ Construction Start: December 17, 2018

Aubrey Elementary School #3 is a ne wsingle-story 93,993 square foot facility with associated site wotk & playground area for the Aubrey Independent School District in Aubrey, TX. The new school will include ICC 500 storm shelter.

Download Bid Documents

Prosper ISD Transportation Facility

Bid Date: November 15, 2018
Owner: Prosper ISD
Lead Estimator: Derek Steinmeyer
Phase: Past Projects

The “Project” of which the “Work” of this Contract is a part, is titled A New Transportation

Facility for Prosper ISD and is composed of a new facility and related site work located in

Frisco, Texas.

Bid Day: November 15, 2018

Bid Time: 2:00PM

Bids Delivered: bid@pogueconstruction.com

Download Bid Documents

Weatherford ISD New Baseball and Softball Complex

Bid Date: November 1, 2018
Owner: Weatherford ISD
Lead Estimator: Sean Reardon
Phase: Past Projects

The Weatherford High School Baseball and Softball Complex consists of the renovation of existing facilities including New Baseball and Softball fields, concessions/restrooms, bleachers and site work. Please note the desire for the base bid all turf fields, alternate all grass fields, and then a requested alternate to do half turf and half grass. This is a CSP bid with all RFIs being due before noon on Monday October 22nd. Pricing will be due no later than 2:00PM on Thursday November 1st, 2018.

Bids Delivered to: bid@pogueconstruction.com

Download Bid Documents

Lewisville ISD Vickery Elementary School Addition

Bid Date: October 30, 2018
Owner: Lewisville ISD
Lead Estimator: Mitch Spencer
Phase: Past Projects

The Vickery Elementary School Addition Project for Lewisville ISD is an 11,640 SF addition to the existing building. This addition is a 10 Classroom Storm Shelter. The structure consists of 12” CMU walls with a 6” Slab-on-Void. The mechanical system is a Roof Top Unit system with storm louvers. All questions must be submitted to Pogue Construction no later than 4:00 PM on October 19th. Bids must be submitted before 2:00 PM; any bids received after 2:00 PM will not be accepted.

Location: 3301 Wager Rd, Flower Mound, TX 75028

Estimated Start Date: December 17, 2018

Estimated End Date: August 1, 2019

Last Day to submit RFIs: October 19, 2018 at 4:00PM

Download Bid Documents

Community ISD New High School, Middle School Conversion, & Elementary School Addition

Bid Date: October 25, 2018
Owner: Community ISD
Lead Estimator: Chris Broerman & Derek Steinmeyer
Phase: Past Projects

Bid Date: October 25, 2018

Bids Due: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

New High School:

  • Location: FM 1138 and County Road 595; Nevada, TX 75713
  • Estimated Start Date: November 13, 2018
  • Estimated End Date: July 1, 2020
  • Pre-Bid Meeting: October 18, 2018 @ 3PM – Community ISD Board Room (for all projects)

Project Description: New high school (~180,000 SF), Ag Shop (~7,100 SF) and associated site work (~75 acres). There are several Alternate Bids for this project – please price them accordingly.

Middle School Renovation:

  • Location: 620 FM 1138; Nevada, TX 75713
  • Estimated Start Date: November 13, 2018
  • Estimated End Date: July 27, 2020
  • Pre-Bid Site Visit: October 9, 2018 @ 1PM

Project Description: Renovation of the existing high school. There are several Alternate Bids for this project – please price them accordingly.

NeSmith Elementary School Addition:

  • Location: 801 Presidents Blvd.; Lavon, TX 75166
  • Estimated Start Date: November 13, 2018
  • Estimated End Date: July 1, 2019
  • Pre-Bid Site Visit: October 9, 2018 (immediately following the Middle School site visit)

Project Description: Addition to an existing elementary school (~8,250 SF) and associated site work.

 

Download Bid Documents

McKinney Public Safety Building Renovation

Bid Date: October 17, 2018
Owner: City of McKinney
Lead Estimator: Kevin Hollenbeck
Phase: Past Projects

The McKinney Public Safety Bldg. Renovation is a FIVE Phase project consisting of New Security Vestibule, Training Rooms, Offices, SWAT Prep and Briefing Rooms for the City of McKinney, TX. The facility will be operating in full capacity during phased renovations. Sheet A01.22 is the Phasing plan for Level 1 & 2.

City Council GMP Approval: November 6, 2018

Pre-Construction Conference: TBD

Notice to Proceed-Mobilization/Start Construction: November 7, 2018

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Download Bid Documents

Plano – Police Substation

Bid Date: October 11, 2018
Owner: City of Plano
Lead Estimator: Kevin Hollenbeck
Phase: Past Projects

The Plano Police Substation (McDermott and Robinson) project is a new 2-story; 23,142 square foot facility with associated site work & yard for the City of Plano, TX. The new facilities exterior design is a mixture of brick and stone with aluminum framing. All glazing will be E-Coated. This project will also include an ICC 500 Storm Shelter.

RFI Due Date: October 2, 2018 @ NOON

Bids Delivered to: bid@pogueconstruction.com

Download Bid Documents

Mesquite Admin Building Renovation – Early Electrical Package ONLY

Bid Date: October 11, 2018
Owner: Mesquite ISD
Lead Estimator: Chris Broerman
Phase: Past Projects

EARLY ELECTRICAL PACKAGE ONLY

Narrative: This project consists of installing conduits for two electrical services – one to serve the existing building and one to serve the future addition. The switchover from the old service to the new service at the existing building is anticipated to occur over the Thanksgiving break. This is a CM@R project located in Mesquite, TX, and Pogue is the selected general contractor.

Bid Date: October11, 2018

Bids Due:2:00PM

Bids Delivered to: bid@pogueconstruction.com

Location: 3819 Towne Crossing Blvd.; Mesquite, TX 75150

Estimated Start Date: November 13, 2018

Estimated End Date: November 25,2018

***NOTE*** Bidders are required to submit the Contractor Information (see Section 00 43 36) three days prior to Bid Day.