Bid Date: October 31, 2019
Owner: Lewisville ISD
Lead Estimator: Mitch Spencer
Phase: Past Projects
Location: 5707 Morriss Rd., Flower Mound, TX 75028

Pogue Construction is the selected General Contractor on this project. The Lewisville ISD Marcus High School Hail Damage Roof Repair 2019 Project is a replacement of the remaining damaged roofs at Marcus High School located in Flower Mound, Texas. The project consists of removal of the damaged flat roofs and standing seam metal roofs with replacement in kind. In addition, roof top Mechanical, Electrical, and Plumbing systems will need to be removed and reinstalled to accommodate the replacement roofing system. Replacement of curbs, condensate lines, gas lines, and other MEP systems may be required.

Bid Day: Oct 31, 2019

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

A Pre-Bid walk will be conducted on Tuesday, October 22nd at 1:30 PM at the school.