Pasadena ISD George Thompson Intermediate School

← BACK TO ALL BIDS
Bid Date: June 8, 2021
Owner: Pasadena ISD
Lead Estimator:
Phase: Past Projects
Location: South of the intersection of Hughes Road and Riverstone Falls Drive in Pearland, Texas.

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

The project consists of the construction of a new 160,267 square feet elementary school for 1200 students on a 26.1 acre tract to replace the existing George A. Thompson Intermediate School. Sitework includes grading, storm drainage, playfields, reinforced concrete parking and driveways, fencing, and landscaping and irrigation. The structural systems include drilled and underreamed piers, concrete grade beams, concrete slab on grade, and a steel frame. Exterior walls are masonry veneer and metal panels with masonry and steel stud backup. Interior partitions are of CMU and gypsum board on steel studs. Finishes include carpet, resilient flooring, ceramic tile, quartz flooring, natural stone, paint and suspended acoustical ceilings. Dry marker boards, tackboards, toilet partitions, aluminum walkway covers, acoustical panels, kitchen equipment, casework, and horizontal blinds are also a part of the Work. The project also includes new HVAC systems, electrical systems, fire sprinkler system, and plumbing systems

← BACK TO ALL BIDS