Bid Information

For questions regarding a bid, please email bid@pogueconstruction.com.

For bid tab requests and feedback on the status of your bid, please email tab@pogueconstruction.com.

To get on Pogue’s bidder’s list, please fill out this form: https://projects.isqft.com/pogueconstruction/form

Princeton ISD Mattei Middle School

Bid Date: April 20, 2021
Owner: Princeton ISD
Lead Estimator: Chris Broerman
Phase: Bidding/GMP
Location:

Bid Time: 2:00PM

Bids Delivered To: bid@pogueconstruction.com

Architect: Claycomb

New Middle School building for Princeton ISD (~150,000 SF) and associated site work (~30 acres)

View/Download Bid Documents

City Of Allen Stephen G Terrell Recreation Center

Bid Date: April 30, 2021
Owner: City of Allen, Parks Department
Lead Estimator: TBD
Phase: Competitive Sealed Proposal/Hard Bid
Location: Allen, TX 75013

Bid Day: April 30, 2021

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: BRS Architecture

Budget: $54 Million

The Project consists of the construction of a new recreation and community center facility and associated site construction as more completely described in the Contract Documents.

A Pre-Proposal Conference will be held at 10:00 AM, Monday April 12, 2021 via teleconference. Call information is Phone: (830) 476-3317, Conference ID: 394 926 267#. This number is also compatible with Microsoft TEAMS.

 

View/Download Bid Documents

Lewisville ISD 3 Middle School Track Replacements

Bid Date: May 4, 2021
Owner: Lewisville ISD
Lead Estimator: Josh Neumaier
Phase: Bidding/GMP
Location:

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Location:

Track Replacement at Creek Valley Middle School
Creek Valley Middle School
4109 Creek Valley Boulevard Carrollton, Texas 75010

Track Replacement at Durham Middle School
Durham Middle School 2075 South Edmonds Lane
Lewisville, Texas 75067

Track Replacement at Lakeview Middle School
Lakeview Middle School
4300 Keys Drive
The Colony, TX 75056

Pogue Construction is the selected General Contractor for this project. This project consists of track replacements at Creek Valley Middle School, Durham Middle School, and Lakeview Middle School.

View/Download Bid Documents

Cleveland ISD – High School Paint & Middle School Renovations

Bid Date: May 6, 2021
Owner: Cleveland ISD
Lead Estimator: Derek Steinmeyer
Phase: Competitive Sealed Proposal/Hard Bid
Location: Cleveland, TX 77327

Bid Time: 1:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee

Substantial Completion Dates:

Band Hall Renovation: August 1, 2021

Classroom Paint: August 1, 2021

Corridor Paint: September 7, 2021

Pre-proposal Meeting: Tuesday April 27, 2021 @ 2:00PM

The Owner plans to paint the existing high school that was not included in the previous expansion, and to renovate the existing band halls at the existing high school and middle school.

View/Download Bid Documents

City of Plano Joint Use Police Substation Remodel

Bid Date: May 12, 2021
Owner: City of Plano
Lead Estimator: TBD
Phase: Competitive Sealed Proposal/Hard Bid
Location: 7501-A Independence Parkway, Plano, Texas 75025

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

The project consists of approximately 2,600 square feet of major renovation and approximately 10,200 square feet of minor renovation. Some areas of minor renovation will be occupied for much of the project.

The major renovated area consist of removal of all finishes, the floor slab, removal of some sub-grade soil, installing a micro pile system to support a new slab on void floor system. The major renovated area includes replacing the finishes and systems in the existing locker rooms and briefing area.

The areas of minor renovation include renovation of finishes and some systems in office areas.

Trades utilized may be: demolition, micro piles, concrete, framing, carpentry, cabinetry, waterproofing, doors, frames, door hardware, drywall, ceramic tile, suspended ceilings, resilient flooring, carpet tile, painting, signage, toilet compartments, toilet accessories, AED’s, fire extinguishers, duty lockers, plastic lockers and benches, fire protection, plumbing, HVAC, electrical, data cabling and audio visual systems.

 

View/Download Bid Documents

Cleveland ISD – Northside Elementary School Replacement

Bid Date: May 25, 2021
Owner: Cleveland ISD
Lead Estimator: TBD
Phase: Competitive Sealed Proposal/Hard Bid
Location: Cleveland, TX 77327

Bid Time: 1:00PM

Substantial Completion: July 2022

Budget: $26,000,000

Architect: VLK

Pre-Bid: May 13, 2021 at 10:30AM – Cleveland ISD Service Center (326 FM 1010 Rd Cleveland TX 77327) or https://teams.microsoft.com/l/meetup-join/19%3ameeting_Mjc3MjlhOTYtYTZlZi00ZmE1LWIyZjMtNjIzZmQyZWM4NGMy%40thread.v2/0?context=%7b%22Tid%22%3a%226724d89b-03d2-4528-9030-0eb337b1b2bb%22%2c%22Oid%22%3a%2270b2af40-0328-4eae-8897-31f803f12229%22%7d

The Owner plans to build a new two-story Elementary School (approximately 137,000 sf for approximately 1,200 students).

View/Download Bid Documents

Prosper High School #3

Bid Date: May 26, 2021
Owner: Prosper ISD
Lead Estimator: Derek Steinmeyer
Phase: Bidding/GMP
Location: Prosper, TX

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee

Pre-Bid: May 11, 2021 @2:00PM – https://pogueconstruction.zoom.us/s/94735221865

Pogue Construction is the selected General Contractor for this project. The scope of work for this project includes a new 531,000 sqft, two-story high school building, a new 76,000 sqft multi-purpose building and multiple sports related out buildings on an 81 acre site located approximately at East 1st Street and Granite Shoal Drive in Prosper, TX.

Important Notes:

PISD is open to voluntary VE options for this project. In the course of preparing your proposal, please list any voluntary VE items that are applicable to your scope of work

The Concrete Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.)

03A- Concrete (High School Bldg & Appurtenances) will include the High School Building, Courtyards, Mechanical Yards, Steps, Ramps, Planters, Screen Walls, Stoops and Hinge Slabs. Refer to the Bid Packages that will be issued no later than May 19th for additional information.

03B- Concrete (Outbuildings & Site) will include the Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts and all Site Flatwork to the High School Hinge Slabs and Cast-In-Place Retaining Walls . Refer to the Bid Packages for additional information.

 

The Masonry Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.)

04A- Masonry (High School Bldg & Appurtenances) will include the High School Building, Courtyards, Mechanical Yards, Steps, Ramps, Planters, Screen Walls, Stoops and Hinge Slabs. Refer to the Bid Packages that will be issued no later than May 19th for additional information.

04B- Masonry (Outbuildings & Site) will include the Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts All Site Flatwork to the High School Hinge Slabs and Cast-In-Place Retaining Walls . Refer to the Bid Packages for additional information.

 

The Electrical Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.)

26A- Electrical (High School)

26b- Electrical (Multi-Purpose Bldg) will include all electrical work within the MPF building footprint.

 

We will require accounting breakouts for the following:

Off Site Work per C4 Series Drawings

Site Work

High School Building, Area A thru S per A1.01 & A1.02

Multi-Purpose Facility, Area T, U & V per A1.03

Concessions, Football Area W per A1.25

Concessions, Baseball Area X per A1.25

Batting Cage, Baseball Area Y per A1.25

Ticketing, Football Area Z thru S per A1.25

Ticketing, Baseball Area AA thru S per A1.25

Ticketing, Softball Area BB thru S per A1.25

Batting Cage, Softball Area CC per A1.25

Pump Room Area DD per A1.25

Track & Athletic Field, Equipment, Scoreboards, Fencing, Bleachers/ Press Box, Etc.

Baseball Field, Equipment, Scoreboards, Dugouts, Bullpens, Fencing, Bleachers/ Press Box, Etc.

Softball Field, Equipment, Scoreboards, Dugouts, Bullpen, Fencing, Bleachers/ Press Box, Etc.

Tennis Courts, Equipment, Scoreboards, Fencing, Bleachers, Etc.

View/Download Bid Documents