Bidding/GMP

Lone Oak ISD – High School Additions & Renovations

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction has been selected as the CM@R for the construction of the High School Addition and Renovations at Lone Oak High School. The project consists of construction of a new 67,940 sf addition to the high school. Construction will include a new Competition Gym, locker rooms, dining area, kitchen, concessions stand area, band hall, classrooms & science classrooms. Several of the areas will be hardened to meet the requirements for a storm shelter in the addition. Scope of work will include but not be limited to – selective demolition, structural concrete, drilled piers, polished/sealed concrete, masonry, structural steel, miscellaneous steel, millwork, waterproofing, EIFS, fireproofing, caulking and sealants, insulation, roofing, metal wall panels, d/f/h, glass & glazing, translucent wall panels, won doors, drywall, acoustical ceilings and wall panels, ceramic tile, resilient flooring, athletic flooring, wood gym flooring, painting, visual display, signage, toilet partitions & accessories, miscellaneous specialties, food service equipment, commercial laundry equipment, residential appliances, projection screens, lockers, canopies, athletic equipment, scoreboards, science equipment, window coverings, music casework, telescoping bleachers, fixed seating, fire sprinklers, plumbing, HVAC, electrical, structured cabling, A/V systems, public address system, fire alarm, access control, security, ERRRS, sitework, termite treatment, fencing, segmented retaining walls, landscape and irrigation, site utilities, concrete paving, asphalt paving, pavement markings, lime stabilization, and pavement markings.

A pre-bid meeting will be held on April 14th with the time and location to be announced later. Pogue is requesting bids for this GMP Package on April 26, 2023 at 2:00 PM. Please send bids to bid@pogueconstruction.com. There is to be no contact with the owner or design team and all questions, RFI’s and substitution request must be sent to lpickens@pogueconstruction.com or dnaylor@pogueconstruction.com.

READ MORE

Montgomery ISD – Lake Creek High School Additions and Renovations

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: This two-story addition/renovation consists of, but is not limited to, slab-on-crawlspace, structural steel, additional science rooms, additional kitchen equipment, terrazzo flooring, exterior brick and stone, and metal wall panels.

****PRE-BID MEETING on April 11th @ 3:00 PM at Lake Creek High School (20639 FM 2854 Rd, Montgomery, TX 77316).****

READ MORE

Montgomery ISD – New Elementary School #7 (Creekside ES)

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the chosen GC for this CMAR project. This 97,865SF building consists of, but is not limited to, slab-on-crawlspace, structural steel, new utility infrastructure with site paving and detention, terrazzo flooring, millwork, and more.

****PRE-BID MEETING on April 11th @ 3:00 PM at Lake Creek High School (20639 FM 2854 Rd, Montgomery, TX 77316).****

READ MORE

City of Plano – City Hall Council Chambers & Action Center Renovations

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this project. This project will consist of renovations to an existing Council Chamber and Action Center. A pre-bid site walk is TBD. Pogue will send out a notification once the pre-bid date is selected.

*****Pre-bid Meeting – March 6, 2023 @ 10 AM. Location – 1520 K Avenue, Plano, TX 75074*****

*****Pre-bid RFI Deadline: March 9, 2023 @ 5 PM*****

 

READ MORE

Prosper ISD – New High School #4: Package 1

Bid Time: 2:00 PM

Deliver Bids To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this project. The scope of work for this project includes a new 573,000 sqft, two-story high school building, a new 76,000 sqft multi-purpose building and multiple sports related out buildings.

 

IMPORTANT NOTES

Structural Foundation Drawings will be issued in an Addendum.

PISD is open to voluntary VE options for this project.  In the course of preparing your proposal, please list any voluntary VE items that are applicable to your scope of work

The Concrete Scope will be Bid in multiple Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.)

03A- Concrete (High School Bldg & Outbuildings) will include the High School Building, Courtyards, Mechanical Yards, Steps, Ramps, Planters, Screen Walls, Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts.  Refer to the Bid Packages that will be issued no later than February 21st for additional information.

03B- Concrete (Sitework, Flatwork, and Paving) will include the all site related concrete flatwork and paving. This scope of work will be issued in the Site Package set of documents, currently projected to be bid out on 4/25/2023.

 

The Masonry Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.)

04A- Masonry (High School Bldg & Appurtenances) will include the High School Building, Courtyards, Mechanical Yards, Steps, Ramps, Planters, Screen Walls.  Refer to the Bid Packages that will be issued no later than February 21st for additional information.

04B- Masonry (Outbuildings & Site) will include the Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts.  Refer to the Bid Packages for additional information.

 

The Roofing Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.)

07C- Roofing and Sheetmetal (High School Bldg & Appurtenances) will include the High School Building, Courtyards, Mechanical Yards, Planters, Screen Walls.  Refer to the Bid Packages that will be issued no later than February 21st for additional information.

07D- Roofing and Sheetmetal (Outbuildings & Site) will include the Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts.  Refer to the Bid Packages for additional information.

 

The Electrical Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.)

26A- Electrical (High School)

26b- Electrical (Multi-Purpose Bldg) will include all electrical work within the MPF building footprint.

 

We will require accounting breakouts for the following: (we need to check these page references and scope)

Site Work

High School Building, Area A thru S per A1.01 & A1.02

Multi-Purpose Facility, Area T, U & V per A1.03

Concessions, Football Area W per A1.25

Concessions, Baseball Area X per A1.25

Batting Cage, Baseball Area Y per A1.25

Ticketing, Area Z per A1.25

Ticketing, Area AA per A1.25

Ticketing, Area BB per A1.25

Batting Cage, Softball Area CC per A1.25

Pump Room Area DD per A1.25

READ MORE

Community ISD – Elementary School #5

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: This project is a new 84,000 sf elementary school. Structural Steel, Roofing, and HVAC trades as well as Electrical Switchgear have already been awarded based on the Early Release Package and are not included in this bid.

READ MORE

Community ISD – Middle School #2

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this Project. This Bid consists of a new ground-up middle school. Structural Steel, Roofing, Food Service Equipment, Earthwork, and SWPPP were awarded with the Early Bid Package. All other trades are out for bid.

READ MORE

Community ISD – NeSmith ES Addition & Renovation

***PRE-BID MEETING: The meeting to review site conditions will begin at McClendon ES Thursday, January 26th at 3:30 PM and move to NeSmith ES at 4:15 PM. ***

***RFI DEADLINE: February 1, 2023***

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this Project. This Bid consists of Additions and Renovations to an existing elementary school. Structural Steel was awarded with the Early Bid Package. All other trades are out for bid.

READ MORE

Community ISD – McClendon ES Addition & Renovations

***PRE-BID MEETING: The meeting to review site conditions will begin at McClendon ES Thursday, January 26th at 3:30 PM and move to NeSmith ES at 4:15 PM. ***

***RFI DEADLINE: February 1, 2023***

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for this Project. This Bid consists of Additions and Renovations to an existing elementary school. Structural Steel was awarded with the Early Bid Package. All other trades are out for bid.

READ MORE

Princeton ISD – Lovelady High School Addition

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for the Project.

Narrative: In general, the project consists of LOVELADY HIGH SCHOOL ADDITION 2022 which includes but is not limited to: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joists, metal deck, single ply roofing, steel studs and drywall, masonry, aluminum, steel and plastic laminate covered doors, aluminum windows, electrical, plumbing, and HVAC.

Interior finishes include but are not limited to: steel studs and drywall, resilient flooring, carpet tiles, ceramic tile, acoustical ceiling, millwork, casework, expansion joint covers, marker board, tack boards, projection screens, fire extinguishers and cabinets, toilet partitions, toilet accessories, metal lockers, identifying devices, and window blinds.

 

READ MORE
1 2 3 4 5 9