Past Projects

Prosper ISD – Elementary School #20

“The Work”: New Elementary School #20​ for ​Prosper ISD​ is comprised of ​a new facility​ and related ​site​ work located in ​Celina, Texas​. Includes new elementary school​, including all mechanical, electrical, plumbing, and general construction work.

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

READ MORE

Prosper ISD – Elementary School #19

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: New Elementary School #19​ for ​Prosper ISD​ is composed of ​a new facility​ and related ​site​ work located in ​Prosper, Texas​. Includes new elementary school​, including all mechanical, electrical, plumbing, and general construction work.

READ MORE

Alvarado ISD – New Alvarado Elementary North

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for Alvarado ISD New Elementary North. The Project is composed of ​​a new elementary campus​​ and related site​​ work located in ​​Alvarado, Texas​​. The “Work” is defined in the Contract Documents to include, but not necessarily to be limited to new elementary campus, including all mechanical, electrical, plumbing, sitework, utilities, and general construction work.

READ MORE

City of Plano – Fire Station #5 Additions and Renovations

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

City of Plano Fire Station #5 is a renovation and addition to the existing Fire Station on West Park Blvd. Building is 13,727+/- square feet. We will be renovating the inside of the existing station for new dorms, restrooms, offices and laundry areas as well as modifications to the existing Apparatus Bays. The addition will include a new kitchen, dayroom, fitness room, main entry, 2 addition Apparatus Bays and support areas. This project will have some phasing to allow the station to remain operational while under construction. Proposals will be received on October 31st, 2023 at 2:00 PM. Project is currently scheduled to start construction in January 2024 and be completed in December 2024. All questions should be directed to Dennis Naylor at dnaylor@pogueconstruction.com or via building connected. There should be no contact with the owner or the design team.

READ MORE

Princeton ISD – Early Childhood & Jaguar Daycare

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Princeton ISD will be constructing an Early Childhood & Daycare center. Work associated with this project but is not limited to: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joints, metal deck, single ply roofing, steel studs, drywall, masonry, stucco, aluminum, steel and plastic laminate covered doors, aluminum windows, electrical, plumbing, HVAC, steel studs and drywall, resilient flooring, carpet tiles, quarry tile, wood gym floor, paint, acoustical ceiling, millwork, casework, expansion joint covers, marker board, tack boards, projection screens, fire extinguishers and cabinets, rolling shelves, toilet partitions, toilet accessories, metal lockers, plaque, identifying devices, and window blinds.

READ MORE

Aubrey ISD – Additions and Renovation Early Bid Package

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: The Aubrey High School Additions and Renovations project consists of five (5) additions to the existing Aubrey High School.  The overall square footage of additions is approximately 150,000 SF along with interior renovations adjacent to the additions, as well as other areas.  Currently, we are seeking proposals for furnishing of mechanical equipment and electrical switch gear only.  Bid packs for these scopes are forthcoming.

READ MORE

City of McKinney – Fire & Admin Building

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: City of McKinney will be constructing a Fire Department Head Quarters Complex just east of the existing Public Safety Building. This project will consist of a 14,738 sf Fire Station, a 43,173 sf 2 story Administration Building and a 18,972 sf Logistics Building.

Work associated with this project includes but is not limited to the following:

03A – Concrete, 03B – Concrete Staining/Polishing, 04A – Masonry, 05A – Metals, 05B – Specialty Metals, 06D – Finish Carpentry, 07A – Waterproofing/Air Barriers/Caulking, 07C – Roofing & Sheet Metal, 07D – Metal Roof & Wall Panels, 07E – Fireproofing & Firestopping, 07F – Expansion Control, 08A – Doors, Frames & Hardware, 08C – Coiling/Overhead Doors & Grilles, 08E – Glass & Glazing, 09A – General Trades, 09B – Drywall/Acoustical, 09C – Tiling, 09D – Carpet/VCT/ Base, 09E – Athletic Flooring, 09H – Terrazzo Flooring, 09I – Fluid Applied Flooring, 09J – Access Flooring, 09K – Painting & Wall Coverings, 09L – Plaster/Stucco, 10B – Visual Display Units, 10C – Signage, 10D – Toilet Accessories & Compartments, 10E – Wall & Door Protection, 10F – Fire Protection Specialties, 10G – Lockers & Metal Storage Shelving, 10J – Awnings/Canopies, 10L – Flagpoles, 10M – Misc. Specialties, 11B – Loading Dock Equipment, 11C – Residential Appliances, 11D – Food Service Equipment, 11M – Misc. Equipment, 12B – Window Treatments, 13F – Saunas, 14A – Elevators, 21A – Fire Suppression, 22A – Plumbing, 23A – HVAC, 26A – Electrical, 27A – Voice & Data, 27B – Audio Video, 27C – Local Sound Reinforcement , 28A – Fire Alarm, 28B – Security System, 28C – Access Control, 28D – Emergency Responder Radio Coverage System, 31A – Earthwork, 31B – Termite Control, 31C – SWPPP, 31E – Site Requirements, 32C – Pavement Markings/Specialties, 32G – Fences & Gates, 32H – Retaining Walls, 32I – Planting, Irrigation, Turfs & Grasses, 33A – Site Utilities

READ MORE

City of Plano – Fire Station #5 Early Package

Bid Time: 2:00 PM

Bids delivered to bid@pogueconstruction.com

Narrative: City of Plano Station #5 is a renovation and addition to the existing Fire Station on West Park Blvd. Building is 13,700+/- square feet. We will be renovating the inside of the existing station for new dorms, restrooms, offices and laundry areas as well as modifications to the existing Apparatus Bays. The addition will include a new kitchen, dayroom, fitness room, main entry, 2 addition Apparatus Bays and support areas. Project is currently scheduled to start construction in December 2023 and be completed December 2024.

Please note that we are only seeking proposals at this time for the Commercial Range (Bid Package 11D), HAVC RTU’s (Bid Package 23 B) and Electrical Generator, ATS, Switch Gear (Bid Package 26B).

READ MORE