Past Projects

Prosper ES #14 & Rucker ES Additions and Renovations

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Designer: Huckabee

Estimated Start Date: May 2020

Estimating Completion: May 2021

Pogue Construction is the selected General Contractor on the Prosper ISD Elementary School #14. This project consists of a new ground up elementary school. The project will include all trades required for the construction of the building and associated site work – including and is not limited to: Concrete, Drywall, Structural Steel, Earthwork, Utilities and Electrical/Mechanical trades. The building project is set to begin in May of 2020 and run through May of 2021.

READ MORE

Wylie ISD Groves ES & Whitt ES Additions

Architect: PBK

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for these projects. Scope of work is classroom/storm shelter addition, canopy re-work, and office renovation at Groves ES and the addition of a classroom/storm shelter to Whitt ES.

RFI’s: Pogue Construction will receive questions related to the plans, specifications, and existing conditions for this project until 5PM on 9/11/20. Send all questions to bid@pogueconstruction.com.

Pre-Bid Conference: Pogue will host a pre-bid meeting for this project on 9/16/20 at 9AM via zoom webinar. All questions related to existing conditions will be addressed during the pre-bid meeting.

You are invited to a Zoom webinar.
When: Sep 16, 2020 09:00 AM Central Time (US and Canada)
Topic: Wylie ISD Whitt & Groves Pre-Bid

Register in advance for this webinar:
https://pogueconstruction.zoom.us/webinar/register/WN_41-sM89KRPq_rc0iAgHgoA

After registering, you will receive a confirmation email containing information about joining the webinar.

 

 

READ MORE

Aubrey ISD High School Auditorium Addition

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: Huckabee

Pre-Bid Information: November 5, 2020 at 10:00AM

Join Zoom Meeting: https://pogueconstruction.zoom.us/j/8024773618

Meeting ID: 802 477 3618

Pogue Construction is the selected General Contractor for this project, which consists of a 28,000 SF Auditorium and Band Hall Addition to the existing Aubrey High School.  The Auditorium has a capacity of approximately 700 seats and will be equipped with state-of-the-art curtains, rigging and controls systems, theatrical lighting and A/V systems.  The Addition also includes a new Band Hall equipped with musical storage equipment, A/V and acoustical systems.  The new building addition includes a new slab on grade foundation supported by straight shaft drilled piers and grade beams.  The building superstructure is composed of structural steel, load-bearing and non-load bearing CMU and cold-formed metal framing.  The addition’s façade is composed of face brick, curtain wall, storefront and metal panels.  Tentative schedule is a mid-December 2020 start with a substantial completion of January 2022.

READ MORE

Montgomery County Fire Station #5

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Architect: PGAL (Austin)

Pogue Construction is the selected General Contractor for this project. The building sits on an approx. 2-acre site and contains 2 drive-through apparatus bays. Adjacent to the bays are service areas including a gear room, laundry room, and small electrical room. The interior consists of five single dorm sleeping quarters with 3 separate single use bathrooms, a watch office and a SAFE room / office, a physical fitness/workout room, a day room, dining room and kitchen area with 3 walk-in pantries. The building has support spaces such as mechanical, electrical, data, and storage rooms. A generator will provide emergency power for the entire facility.

Pre-Bid Information:

There is a pre-bid for this project on Tuesday, July 28, 2020 at 2:00PM. This will be hosted virtually through Zoom.

https://pogueconstruction.zoom.us/j/97807786130

READ MORE

Key School Fort Worth – Offsite Utilities Package

Bid Time: 2:00PM

Pogue Construction is the selected General Contractor on the Key School of Fort Worth and is currently bidding on the required offsite utility work. This portion of the project consists of the utility expansion and improvements required for the project site. This will include Storm, Water and Sewer Improvements, Earthwork, Turn Lane Construction and minor electrical improvements. The offsite utilities project is projected to start in April or May of 2020.

READ MORE

Prosper ISD Elementary School #13

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

Designer: Huckabee

Proposed Start Date: 4/21/2020
Substantial Completion: 4/30/2021

Pogue Construction is the selected General Contractor for this project. Prosper ISD Elementary School #13 is a new school located in McKinney, TX. Pogue Construction is the selected General Contractor for this project. The Elementary School is a 95,600 SF, Single Story structure with a gym that is a 6,800 SF Storm Shelter. The main building will be ICF construction, while the storm shelter will be constructed with Pre-Cast Structural Concrete.

 

READ MORE

Lewisville ISD – Lewisville HS Athletic Package 1

Bids Delivered to: bid@pogueconstruction.com

Anticipated Schedule: May 22, 2020 – August 1, 2020

Pogue Construction is the selected General Contractor for this project.This project scope includes Turf Replacement at Football Field, Track & Field Event relocation, with appurtenant demolition, utility work and Pre-Engineered, Pre-manufactured Baseball Pressbox and Ticket Booth installation, with appurtenant demolition, utility, and site work, including all mechanical, electrical, plumbing, and general construction work.

 

Important Note: There is no official Pre-Bid Meeting, however, if you are interested in scheduling an on-site walk thru please email Gale Roberge at groberge@pogueconstruction.com

READ MORE

Goose Creek CISD JHS #6 – Early Civil Package

Bid Date: February 25, 2020 2:00PM

Project Location:

5737 E. Wallisville Road, City of Baytown, Harris County, Texas, 77521.

This is the Early Civil Package for Goose Creek Junior School #6. Work in this package includes but is not limited the following: Site Demolition, Grading & Subgrade Prep, Site Utilities, Storm Water Pollution & Prevention and General Trades Associated with the Site Work.

Important Note: Prebid Information –
Location: Onsite (5737 E. Wallisville Road, City of Baytown, TX 77521)
Date: 2/14/2020
Time 8:00AM

READ MORE

Goose Creek JHS #6

Designer: Pfluger

Pogue Construction is the selected General Contractor for this project. This is a new Junior School that is approximately 180,000 square feet. This will be a two-story facility for 6th, 7th, and 8th grade students. It will consist of an Administration Area, Library, Special Education Classrooms, Science Labs, Fine Arts Spaces, Computer Labs, Full Service Kitchen and Cafeteria, Performing Arts Auditorium, and Competition Gyms. Other work associated with this project is Site Paving and Storm Sewer Related Concrete, Pavement Markings & Site Signage, Site Fence, Track & Competition Football Field & Field Events, Tennis Courts, Landscaping & Practice Fields.

Below you will find the time and zoom link. A Pre-Bid Power Point is located in downloadable folders.

Topic: Goose Creek CISD Junior School #6 Subcontractor Pre-Bid Meeting
Time: Thursday, April 2, 2020 02:00 PM Central Time

Join Zoom Meeting:
https://pogueconstruction.zoom.us/j/880642989?pwd=ZFV5VWYrRmFEWTBDRGVhcEFRQ1VnQT09

READ MORE

Community ISD Athletic Facilities Improvements

The Community Athletic Improvements Project for Community ISD consists of renovations to the existing Baseball and Softball fields, and a new press box for the Football Field.  The 140,000 SF Baseball field will be replaced by a new synthetic turf, clay infield, bleachers, press box, LED Lighting, and dugouts.  The 50,000 SF Softball field will receive the same upgrades as the baseball field.  THE SYNTHETIC TURF FOR BOTH FIELDS IS A DELEGATED DESIGN.  The new football press box will be a prefabricated press box with a covered observation deck.  There are two (2) alternates.  Alternate One is to provide two turf football practice fields.  Alternate Two is to provide new Pre-Engineered Metal Building Batting Cages and Bullpens.

 

*IMPORTANT NOTE* A pre-bid meeting will be held at the Community ISD Softball/Baseball Complex at 611 FM 1138 North, Nevada, TX, on Thursday, January 23rd at 11:00 AM.  It is strongly advised that subcontractors intending to bid attend the site walk.

READ MORE
1 16 17 18 19 20 26