Past Projects

Aubrey ISD – Elementary School #4 Final GMP

Bid Deadline: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for Aubrey ISD New Elementary School #4. The Project is composed of ​​a new elementary campus​​ and related site​​ work located in ​​Aubrey, Texas​​.

The July 13th bid day includes all of the scopes listed below:

  • 04A – Masonry
  • 05B – Specialty Metals (Stainless Steel)
  • 06D – Finish Carpentry
  • 07A – Waterproofing / Air Barriers / Caulking
  • 07B – Foam in Place Insulation
  • 07C – Roofing & Sheet Metal
  • 07D – Wall Panels
  • 07E – Fireproofing & Firestopping
  • 07F – Expansion Control
  • 08A – Doors, Frames, & Hardware
  • 08C – Coiling / Overhead Doors & Grilles
  • 08D – Panel Doors
  • 08E – Glass & Glazing
  • 09B – Drywall / Acoustical
  • 09C – Tiling
  • 09D – Carpet / VCT / Base
  • 09E – Athletic Flooring
  • 09F – Wood Strip & Plank Flooring
  • 09I – Fluid Applied Flooring
  • 09K – Painting & Wall Coverings
  • 09L – Plaster / Stucco
  • 10B – Visual Display Units
  • 10C – Signage
  • 10D – Toilet Accessories & Compartments
  • 10E – Wall & Door Protection
  • 10F – Fire Protection Specialties
  • 10G – Lockers
  • 10J – Awnings / Canopies
  • 10L – Flagpoles
  • 11C – Residential Appliances
  • 11G – Broadcast, Theater & Stage Equipment
  • 11J – Gymnasium Equipment/Scoreboards
  • 11K – Patient Care Equipment
  • 12B – Window Treatments
  • 12J – Site Furnishings
  • 27A – Voice & Data
  • 27B – Audio Video
  • 27C – Local Sound Reinforcement
  • 28B – Security System
  • 28C – Access Control
  • 31B – Termite Control
  • 32I – Planting, Irrigation, Turfs & Grasses

All other scopes of work not listed above were previously bid. We appreciate your partnership and look forward to your participation on this project

READ MORE

Sanger ISD – New Sanger High School & Field House

Bid Time: 2:00 PM

Bids delivered to bid@pogueconstruction.com

Narrative: The work comprises the construction of A New High School & Field House for Sanger Independent School District, Sanger, Texas, as shown on the drawings and described in the specifications.

READ MORE

Argyle ISD – Intermediate Fire Lane Addition

Bid Deadline: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Work of this Contract comprises of new parking lot including Civil, Landscaping, and Electrical Work at Argyle Intermediate School located at 800 Eagle Dr., Argyle, TX 76226, for Argyle Independent School District, Owner.

READ MORE

Aubrey ISD – Elementary #4 Food Service & Electrical

Bid Deadline: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for Aubrey ISD New Elementary School #4. The Project is composed of ​​a new elementary campus​​ and related site​​ work located in ​​Aubrey, Texas​​.

This bid day is strictly for the following bid package scopes:

  • 11D – Food Service
  • 26B – Electrical

All other scopes of work not noted above will bid at a date to be determined in mid-July once more complete documents are available. Sorry about any inconvenience. We appreciate your partnership and look forward to your participation on this project

READ MORE

Aubrey ISD – New Elementary School #4

Bid Time: 2:00PM

Deliver Bids To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected General Contractor for Aubrey ISD New Elementary School #4. The Project is composed of ​​a new elementary campus​​ and related site​​ work located in ​​Aubrey, Texas​​. The “Work” is defined in the Contract Documents to include, but not necessarily to be limited to new elementary campus, including all mechanical, electrical, plumbing, and general construction work.

Note: The following trades were bid with Early Packages: RTUs, Electrical Switchgear, Site Concrete, Earthwork, SWPPP, Site Requirements, Pavement Markings, Fences/Gates, and Site Utilities.

***** Bidding Update *****

Notice to All Bidders:

 There has been a schedule revision for bidding of the Aubrey ES #4 project.  The June 6, 2023 bid date will consist of only the following scopes of work: building concrete, precast concrete, structural steel, playground, elevators, fire sprinkler, plumbing, mechanical and fire alarm.

 Pogue is expecting more complete documents for the Foodservice Equipment and Electrical scopes of work on Wednesday (6/7).  Those two trades will then subsequently bid on Tuesday (6/13).

 All other scopes of work not noted above will bid at a date to be determined in mid-July once more complete documents are available.  Sorry about any inconvenience.  We appreciate your partnership and look forward to your participation on this project.

READ MORE

Community ISD – Middle School #2 – Offsite

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for this project. The scope of work for this project includes the following Offsite Work bid packages for Community ISD – Middle School #2 Offsite – GMP:

  • 03A – Concrete
  • 07A – Waterproofing/Air Barriers/Caulking (Pavement sealants)
  • 26A – Electrical
  • 31A – Earthwork
  • 31C – SWPPP
  • 32A – Asphalt Paving
  • 32C – Pavement Markings/Specialties
  • 32I – Planting, Irrigation, Turfs & Grasses
  • 33A – Site Utilities
READ MORE

Prosper ISD – Elementary School #18 – Civil and Landscape Package (RFP 001)

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Narrative: Pogue Construction is the selected GC for this project. The work consists of Site Work related to New Elementary School #18.

****Please note the original Plans, Specs and Addenda (1-3) are posted for reference for bidding RFP 001 (Civil and Landscape Package). ****

Please provide breakout pricing for the Offsite Work as indicated on the C2 and C3 series drawings.

Bidding the Site Work includes the following Bid Packages:

  • 03B Site Concrete
  • 04A Masonry
  • 05A Metals
  • 07B Site Sealants
  • 07C Sheet Metal
  • 09K Painting
  • 10C Signage
  • 31A Earthwork
  • 31C SWPPP
  • 31E Site Requirements
  • 32A Traffic Signals
  • 32C Pavement Markings
  • 32G Fences/Gates
  • 32I Planting and Irrigation
  • 33A Site Utilities
READ MORE