Past Projects

Magnolia ISD Alpha Academy Additions

The Alpha Academy Additions Project consists of a 6,000 SF Pre-Engineered Metal addition for Magnolia ISD in Magnolia, TX. The new addition will serve as the Media Center for the Academy with Classrooms and restrooms. This project is a CSP bid and proposals are due back to Pogue Construction no later than 2:00 PM on Wednesday, May 8th.

Anticipated Start Date: May 20, 2019
Completion Date: November 1, 2019

READ MORE

Mesquite ISD Choice High School

Pogue Construction is the selected General Contractor for this project. The project consists of a new Career and Technology Education center for Mesquite ISD high school students. The new school site is located at an approximately 44-acre undeveloped site at the north intersection of Faithon P Lucas Sr. Blvd and McKenzie Road in Mesquite, TX (east of existing City of Mesquite softball fields). The program includes career and college preparation departments that will provide project-based learning for real world experience.

• The building will utilize sustainability features that allow focus on reducing energy consumption, minimizing long-term environmental impact, and daylighting to efficiently reduce the cost of lighting and cooling.
• The scope of construction will also include an ICC 500 storm shelter (approx. 13,000 SF) serving the entire school and other safety features that allow students to feel safe.
• Approximate Area: 250,000 SF total on (2) two stories

• The school will include departments, such as:
Engineering – Computer Labs, Robotics, Automotive, Maker Spaces, etc.
Health Science – Labs, EMT, Pharmacy, Sports Medicine, Dental, etc.
Technology – Computer Sciences, Maker Spaces, Graphic Design, etc.
Construction Science – Architecture, Construction Shops, Maker Spaces, etc.
Core curriculum – Media Center, Admin, Dining Hall, and Core Classrooms

SCHEDULE
Bid Packs will be posted August 20, 2019
BID DAY – August 29, 2019 @ 2:00 PM
Construction start: October 2019
Completion: July 2021

READ MORE

Wylie ISD High School Early Paving Plan

Pogue Construction is the selected General Contractor for the Wylie ISD High School Early Paving Package. The Wylie High School Paving Package is a new parking lot consisting of minor site demolition & earthwork, storm sewer, concrete paving (approximately 73,000 sf) & sidewalks), parking lot lighting, pavement markings & landscaping/ Irrigation. This work is to be completed over the summer.

Bid Time: 2:00PM

Bids Delivered to: bid@pogueconstruction.com

READ MORE

Key School – Offsite CFA Work

Pogue is the selected general contractor on the Key School project. Included in the work is an offsite CFA project with the City of Ft. Worth. We are soliciting bids for the offsite work with a bid date of 2:00pm on Tuesday, April 16, 2019.

READ MORE

Wylie High School Additions & Renovations

This is a CM@R project and Pogue is the selected Construction Manager. New additions to existing buildings onsite at the existing Wylie High School campus, along with renovations to the interiors of multiple spaces.

The Work of Project is defined by the Contract Documents and consists of the following:  In general, the project consists of additions and renovations to the existing High School, IMPAC Building and fieldhouse.  Additions include Art and Science labs and classrooms, Sports Arena, Choir, and Cafeteria Expansion.  Two new ICC-500 compliant community storm shelters are included in the additions.   A new Career Technical Education (CTE) building will be added to the campus.  Associated site and utility work will be required to accommodate the new additions and expand parking capacity.

Designer: PBK

Approximate Budget: $56,000,000

Estimated Bid Date: July 2019

Estimated Start Date: August 2019

Estimated Completion: August 2021

*IMPORTANT NOTE* Interested Bidders are encouraged to attend the Pre-Bid Meeting on Friday July 26th at 10:30am, located in the school cafeteria at 2550 E Farm to Market Rd 544 Wylie, TX 75098.

READ MORE

New Caney ISD Woodridge Forest Middle School Additions

The project includes a 16 classroom, two-story 28,000 SF addition, expansion of P.E. Athletic Locker Rooms, Fire Alarm Upgrade, 1,700 SF parking lot expansion (20 spaces) and other misc. upgrades.

Bids Due: 3:00PM

Designer: Texas IBI Group, Inc

• Pre-proposal Conference: January 16, 2019 @ 1:30 at the project
• Estimated Start Date: TBD
• Estimated End Date: TBD

Board Award Project: February 18, 2019
Building Permit: February 19, 2019
Substantially Complete: April 30, 2020

 

READ MORE

Montgomery County ESD #8 – Fire Station #1

Pogue Construction is the selected General Contractor for this project. The work of this project is a one story six apparatus bay 18,700 square foot fire station and related site work. The station includes 15 dorms, 2 day rooms, 1 kitchen and 1 kitchenette, a safe room, community room, weight room, gear room, tool/laundry, and mechanical and electrical
spaces.

Architect: PGAL

Bids Delivered to: bid@pogueconstruction.com

Bid Time: 2:00PM

READ MORE

Prosper Public Safety Building

The Prosper Public Safety Building consists of a New 23,159 sf building and approximately 5 acres of associated site work.

BIDDER WILL BE REQUIRED TO FILL OUT A JOB SPECIFIC BIDFORM THAT WILL BE PUBLISHED BY POGUE CONSTRUCTION.

Building Work includes but is not limited to the following: Concrete, Masonry, Structural Steel, Specialty Metals, Carpentry, Waterproofing, Roofing & Sheet Metals, Doors-Frames & Hardware, Glass & Glazing, Plaster/ Stucco, Drywall, Flooring (Tile, Carpet, Athletic, Access), Painting, Miscellaneous Specialties (Visual Display Boards, Signage, Toilet Accessories- Partitions, Wall protection, Life Safety Specialties, Lockers & Metal Shelving, Awnings & Flagpoles), Appliances, Window Treatments, Fire Suppression, Plumbing, HVAC, Electrical, Voice & Data, AV, Fire Alarm, Security/ Access Control.

Bid Day: April 23, 2019
Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com

READ MORE

Wylie Public Safety & Courts

Pogue Construction is the selected General Contractor for this project. Renovation of the existing Public Safety Building (33,600 SF), an Admin / Courtroom addition (14,600 SF), a Sallyport addition (3,200 SF) and associated site work (7.2 acres).

Bids Due: 2:00 PM

Bids Delivered to: bid@pogueconstruction.com

Location: 2000 Highway 78; Wylie, TX 75098
Estimated Start Date: September 3, 2019
Estimated End Date: September 3, 2020
Pre-Bid Meeting: July 18, 2019 @ 1PM (at the project site)

 

*NOTE – Technology drawings and specifications will be issued with Addendum 1 by 7/19/19.

READ MORE
1 19 20 21 22 23 26