Princeton ISD – Lovelady High School Addition

← BACK TO ALL BIDS
Bid Date: January 31, 2023
Owner: Princeton ISD
Lead Estimator: Chris Broerman
Phase: Bidding/GMP / Past Projects
Location: Princeton, TX

Bid Time: 2:00 PM

Bids Delivered To: bid@pogueconstruction.com

Pogue Construction is the selected General Contractor for the Project.

Narrative: In general, the project consists of LOVELADY HIGH SCHOOL ADDITION 2022 which includes but is not limited to: dirt work, utility work, concrete paving, concrete walks, drilled piers, concrete slabs, structural steel, steel joists, metal deck, single ply roofing, steel studs and drywall, masonry, aluminum, steel and plastic laminate covered doors, aluminum windows, electrical, plumbing, and HVAC.

Interior finishes include but are not limited to: steel studs and drywall, resilient flooring, carpet tiles, ceramic tile, acoustical ceiling, millwork, casework, expansion joint covers, marker board, tack boards, projection screens, fire extinguishers and cabinets, toilet partitions, toilet accessories, metal lockers, identifying devices, and window blinds.

 

← BACK TO ALL BIDS