Lewisville ISD Storm Damage Repairs

← BACK TO ALL BIDS
Bid Date: April 12, 2018
Owner: Lewisville ISD
Lead Estimator: Kevin Hollenbeck
Phase: Past Projects
Location:

Pogue Construction, as Construction Manager at Risk, will receive bids for construction subcontracts for the Lewisville ISD – Marcus High School & Highland Village Elementary School Storm Damage Repairs project until April 12, 2018 at 2:00 PM. All bids received after this time will not be accepted. Bids shall be on a lump sum basis and include with them the appropriate bid packages and proposal forms. All bid packages, electronic drawings and specifications are available via login at ISQFT or for free by visiting our website at pogueconstruction.com.

Bid Time: 2:00PM
Bids Delivered to: bid@pogueconstruction.com

← BACK TO ALL BIDS